Nagasaki shipyard of Japan Mitsubish Heavy Industry,.Ltd
|
A batch of ship outfitting elements
|
Stairway, cable mast, mast, stator frame
|
Hua Long Shipping (Thailand) Company
|
Ship configuration and station matching with 12,000 tons marine
|
A batch of hatches
|
ZhangJiagangHarbor Bureau
|
floating suction
|
Floating suction
|
ZhangJiagangHarbor Bureau
|
Supporting construction for No.4&5 transformation
|
Steel bridge approach manufacture
|
Shanghai Yangtong Co.,Ltd.
|
Supporting transformation of ˇ°Hongxiangˇ± Ship
|
Hull section
|
Yangtze River Estuary Project Department of No.2 Harbor Engineering Company of China Transportation Group
|
Guide pile for the offshare platform of ˇ°Changxuˇ± Ship
|
D1200 alloy-steel pipe pile
|
No.7 Project Department of No.1 harbor Engineering Company of China Transportation
|
Steel structures for the third-phase construction of TaicangHarbor
|
Steel structure equipment required by the project
|
Sha Zhou Steel Corporation
|
Ore conveying machinery
|
Conveying machinery supporting orginal No.1 port
|
Fanyang mechanical engineering Co., Ltd. in Zhang Jiagang tariff-free zone
|
The supporting project should be constructed according to the diagram
|
steel structure of the factory
|
ChangzhouHarbor Bureau
|
Wharf construction
|
Production and installation of steel bridge approach
|
JiangYinHarbor Bureau
|
Wharf construction
|
Manufacture and installation of ship fenders
|